After you have decided which sunbed/s are great for your business, you will need to install: (see your electrician for more information).
* If you require up-to 2 sunbeds: Single phase is only required.
* A minimum 50 amp breaker is required per sunbed or VTU, we do recommend a 63 Amp breaker with 10mm cable suppling the power to the room / "single phase" will power up-to 2 sunbeds.
A 45amp, double pole neon switch, 1 per sunbed room.
OR:
A 63amp, 3 pole rotary isolator switch, per sunbed room.
* If you require 3 or more of our commercial sunbeds, you will require 3 phase.
* Phone united utilities (regarding 3 Phase) get a form, fill it in and they will then come out and price the job up and tell you what is required for your sunbed/s. / this process can take months to get installed.
* Contact United Utilities Networks. 0845 050 0108 / then press 2 on your hand-set, then press 1 on your hand-set / 3 phase power supply to your premises.
* The "3 phase option" would be better if you are planning to open a sunbed centre with 3 or more of our commercial sunbeds on your premises / however for this option we would only supply 3 sunbeds on profit-share or the rent-to-buy basis, other sunbeds that maybe required would therfore have to be purchased out-right.